File #: 26-0301    Version: 1 Name: Davis Rd, 15-inch Gravity Sewer Replacement (WW1801K)
Type: Agenda Item Status: Consent Agenda
File created: 7/27/2026 In control: Capital Projects
On agenda: 8/11/2026 Final action:
Title: Consider and take action on a resolution authorizing a construction contract with Ram Rod Utilities, LLC for the Davis Road 15-Inch Gravity Sewer Replacement Project (WW1801K) in an amount not to exceed $378,535.00 and authorizing an additional $37,853.00 for a Work Change Directive budget for a total construction budget of $416,388.00 (Executive Director of Capital Projects)
Attachments: 1. Proposed Resolution, 2. Exhibit A - Construction Contract Agreement, 3. Letter of Recommendation and Bid Tabulation, 4. Project Layout, 5. CIP Project Sheet, 6. CIP Aerial Map (Modif.)
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

Consider and take action on a resolution authorizing a construction contract with Ram Rod Utilities, LLC for the Davis Road 15-Inch Gravity Sewer Replacement Project (WW1801K) in an amount not to exceed $378,535.00 and authorizing an additional $37,853.00 for a Work Change Directive budget for a total construction budget of $416,388.00 (Executive Director of Capital Projects)

 

Background:

Approval of this resolution will authorize the award of a construction contract with Ram Rod Utilities, LLC, for the Davis Road 15-Inch Gravity Sewer Replacement Project (WW1801K) in an amount not to exceed $378,535.00 and authorizing an additional $37,853.00 for a Work Change Directive budget for a total construction budget of $416,388.00.

 

The project scope is to replace approximately 550 linear feet of existing 15-inch gravity sewer along Davis Road near the City’s Davis Road Lift Station using pipe-bursting and open-cut construction methods. Work includes excavation, bypass pumping, appurtenances, coatings, tie-ins, connection to the existing wet well, and all other work necessary to place the replacement gravity sewer into service.   The project also includes rehabilitation of three (3) existing 5-foot-diameter sanitary sewer manholes.

 

Three (3) sealed bids for the project were received on July 20, 2026 (Bid No. 2026-044).  Based on the City’s A+B bidding method and bids and contract times received, Ram Rod Utilities, LLC submitted the lowest responsible and responsive cost value bid in amount of $378,535.00 and 105 calendar days.  Attached is the City’s engineering consultant’s recommendation of award and bid tabulation.

 

 

Attachments:

1.                     Proposed Resolution

2.                     Exhibit A - Construction Contract Agreement

3.                     Letter of Recommendation and Bid Tabulation

4.                     Project Layout

5.                     CIP Project Sheet

6.                     CIP Aerial Map (Modif.)

 

                                     

FUNDING

{X} Funding in the amount of $416,388 is available from Miscellaneous Utility Capital Projects Fund, fund 1055, with expenses charged to project expense string WW1801K- CONSTRUCT- CONSTRUCT -RS CASH.

 

 

STRATEGIC PLANNING

{X} Addresses Strategic Planning Critical Success Factor #1: Develop and Maintain our Infrastructure.