Skip to main content
League City's Logo
File #: 19-0514    Version: 1 Name: RE1803J Aranda Industries construction award
Type: Agenda Item Status: Approved
File created: 9/13/2019 In control: City Council
On agenda: 9/24/2019 Final action: 9/24/2019
Title: Consider and take action on a resolution authorizing a construction contract with Aranda Industries, for the Westwood Subdivision Section 2 Drainage Improvements (RE1803J), in an amount not to exceed $55,281 and authorizing a construction work change directive budget of $5,281 for a total of $60,562 (Director of Budget & Project Management)
Attachments: 1. Data Sheet, 2. Proposed Resolution, 3. Exhibit A - Construction Agreement with Aranda, 4. CIP Project Sheet, 5. Aerial Map

Title

Consider and take action on a resolution authorizing a construction contract with Aranda Industries, for the Westwood Subdivision Section 2 Drainage Improvements (RE1803J), in an amount not to exceed $55,281 and authorizing a construction work change directive budget of $5,281 for a total of $60,562 (Director of Budget & Project Management)

 

 

 

Background:

 

Approval of this resolution will authorize the award of the construction contract to Aranda Industries for the construction of the Westwood Subdivision Section 2 Drainage Improvements and authorize funds for a construction work change directive budget.

 

This project was brought forward from homeowners in the Westwood Subdivision Section 2 which experience excessive ponding in the street and yards during rain events.  This project is part of the Annual Stormwater Improvements project in the FY2020-2024 CIP.  The project was designed in-house and involves the installation of a 24-inch reinforced concrete pipe storm drain from the existing inlet on West Way Dr (entrance off Maple Leaf and parallel to Maple south to the existing detention pond). This allows an alternative path for drainage during 1% exceedance events and the construction of this overflow drain will have minimal impact on the residents living the area.

 

This project consists of:

1.                     Installing 24-inch reinforced concrete pipe (RCP)

2.                     Drainage end sections

3.                     Landscape repairs due to work

4.                     Install reinforced filter fence during construction

5.                     Install  three (3) storm manholes in accordance to the COLC standards

 

The alignment will be in a current reserve area for Westwood Section 2 that is designated for landscaping; therefore, a drainage easement will be needed.

 

Two (2) sealed bids for the project were received September 10, 2019 (Bid No. 19-CIP-034). Aranda Industries submitted the lowest bid, based on the A+B bidding system, in the amount of $55,281 and for a construction time of 120 calendar days.  As noted in the City's contract, liquidated damages in the amount of $160 per day will apply for each calendar day over 120 days from notice to proceed.

 

 

Attached is the City Engineer’s recommendation of award, along with the bid tabulation.

 

Staff requests the approval of the award of the construction contract and authorization of funds, as follows:

1.                     Construction contract with Arandas Industries in the amount of $55,281.

2.                     Establish a construction work change directive budget in the amount of $5,281 (10% of construction amount) that will allow staff to approve minor field changes to expedite decisions and avoid possible construction delays and/or damage claims by the contractor.

 

 

Attachments:

1.                     Data Sheet

2.                     Proposed Resolution

3.                     Exhibit A - Aranda Industries Agreement with Bid Proposal

4.                     Letter of Recommendation with Bid Tab

5.                     CIP Project Sheet

6.                      Aerial Map

 

CONTRACT ORIGINATION: Construction Contract with Aranda Industries has been reviewed and approved by City Attorney's office

               

FUNDING

{X} Funding in the amount of $55,281from Reinvestment Cash with expenses charged to project expense string RE1803J-CONSTRUCT-CONSTRUCT-RE CASH

 

 

STRATEGIC PLANNING

{X} NOT APPLICABLE