File #: 26-0010    Version: 1 Name: Shortlist of Consultants RFQ 25-040
Type: Agenda Item Status: Approved
File created: 12/29/2025 In control: Development Services
On agenda: 2/24/2026 Final action: 2/24/2026
Title: Consider and take action on a resolution approving a shortlist of consultants for Disciplines A-L under RFQ 25-040 (Professional Services for CIP Projects) (Executive Director of Development Services)
Attachments: 1. Proposed Resolution, 2. Exhibit A - Shortlist of Consultants, 3. Exhibit B - SOQ per Discipline Breakdown, 4. Exhibit C - SOQ Submittal Matrix for All Submittals

Title

Consider and take action on a resolution approving a shortlist of consultants for Disciplines A-L under RFQ 25-040 (Professional Services for CIP Projects)  (Executive Director of Development Services)

 

Background:

The City of League City issued Request for Qualifications (RFQ 25-040) to establish an updated list of consulting firms qualified to provide professional services in multiple disciplines through FY2029. 

 

RFQ 25-040 generated a total of 231 individual Statements of Qualifications (SOQs) across 12 disciplines (Disciplines A-L). Discipline M - “Streetlight Infrastructure Planning and Engineering Design” was previously presented to and approved by City Council in October 2025. On additional discipline, Discipline N - “Traffic Operations”, received no submittals. 

 

Approval of this resolution will formalize a list of firms selected to provide most professional services to support the City’s Capital Improvement Program (CIP) and related professional services needs for Service Disciplines A-L.  Under state law, Chapter 2254, “Professional Services Procurement Act”, the selection of engineers, architects, and surveyors is a qualifications-based selection with fees negotiated after the selection.  To ensure conformance with the law and provide greater transparency, the City has developed a proposed list of consultants for Council approval utilizing the process outlined below.

 

RFQ 25-040 invited separate Statements of Qualifications (SOQs) for each service discipline. Responses were evaluated by a multi-departmental committee composed of representatives from Engineering, Planning, Building, Project Management, Parks, and Public Works.

 

Submittals were sorted by service discipline and distributed along with evaluation forms to staff members for their independent evaluations.  The evaluation criteria and maximum attainable points for each were as follows:  Qualifications (25 points); Experience (25 points); Available Resources (10 points); Project Methodology and Approach (15 points); Quality Control and Quality Assurance (15 points); and References (10 points); for a total of 100 points.

 

When the City completed a similar professional services solicitation in 2022, a minimum qualification score of 85% was established for shortlisting firms. For RFQ 25-040, staff reevaluated that approach based on 2 primary factors: (1) the high quality and volume of SOQs received, and (2) the anticipated amount of work available within each discipline over the next 3 years.

 

As a result, staff is recommending discipline specific base qualification scores, rather than a single threshold, to align the number of shortlisted firms with realistic workload demands while maintaining a highly qualified consultant pool.

 

The recommended qualification thresholds and resulting shortlists are summarized as follows:

 

Discipline                     Service Area                     Qualification                      Firms

                                          Score                     Shortlisted

A                     Real Property Appraisal                     70%                     3 of 3

B                     Real Property Abstracting                     67%                     1 of 1

C                     Real Property Acquisition                     89%                     4 of 8

D                     Land Surveying                     90%                     11 of 17

E                     Geotechnical & Construction Materials Testing                     80%                     8 of 15

F                     Water & Wastewater Infrastructure Engineering Design                     88%                     10 of 44

G                     Paving & Drainage Infrastructure Engineering Design                     85%                     16 of 50

H                     Storm Water Infrastructure Engineering Design                     88%                     11 of 38

I                     Traffic & Transportation Engineering Design                     88%                     10 of 22

J                     Building Architectural Design                     88%                     8 of 10

K                     Environmental Assessment Services                     97%                     6 of 12

L                     Landscape Architectural Design                     80%                     6 of 12

 

These recommended thresholds reflect Staff’s professional judgement that the shortlisted firms represent the most qualified and best-positioned teams to support anticipated City needs, while also avoiding an overly large shortlist that could leave firms qualified but with no work or create administrative burden. It should also be noted that inclusion on this shortlist does not guarantee work, and individual projects will continue to be authorized and funded through separate Council actions as part of the adopted CIP or other approved programs.

 

Approval of this item will establish the Disciplines A-L professional services shortlist for use in negotiating professional services contracts through FY2029.

 

 

Attachments:

                      1.  Proposed Resolution

                      2.  Exhibit A - Shortlist of Consultants

                        3.  Exhibit B - SOQ per Discipline Breakdown

                     4.  Exhibit C - SOQ Submittal Matrix for all submittals

 

FUNDING

{X} NOT APPLICABLE

 

STRATEGIC PLANNING

{X} Addresses Strategic Planning Critical Success Factors #1 - Develop & Maintain our Infrastructure and #2 - Financially Sustainable