File #: 26-0135    Version: 1 Name: FM 518 Street Lighting from I-45 to FM 270 Intersection Project (ST2603)
Type: Agenda Item Status: Consent Agenda
File created: 3/30/2026 In control: Capital Projects
On agenda: 4/14/2026 Final action:
Title: Consider and take action on a resolution authorizing a professional services agreement with Kimley-Horn, to prepare a Preliminary Engineering Report (PER) to analyze and evaluate the street lighting needs related to the FM 518 Street Lighting from I-45 to FM 270 Intersection Project (ST2603) in an amount not to exceed $72,500 (Executive Director of Capital Projects)
Attachments: 1. Proposed Resolution, 2. Exhibit A - PSA with Proposal, 3. CIP Project Sheet, 4. CIP Aerial Map, 5. Vendor Report Card
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

Consider and take action on a resolution authorizing a professional services agreement with Kimley-Horn, to prepare a Preliminary Engineering Report (PER) to analyze and evaluate the street lighting needs related to the FM 518 Street Lighting from I-45 to FM 270 Intersection Project (ST2603) in an amount not to exceed $72,500 (Executive Director of Capital Projects)

 

Background:

Approval of this resolution will authorize a professional services agreement with Kimley-Horn to prepare a Preliminary Engineering Report (PER) to analyze and evaluate the street lighting needs related to the FM 518 Street Lighting from I-45 to FM 270 Intersection Project (ST2603) in an amount not to exceed $72,500.  This lighting system will be including but not limited to: the placement, system design, style/height of lights and poles, constructability, system efficiency, conformance with TxDOT permitting requirements.  

 

This corridor is approximately 13,000 feet in length.  The City desires to install decorative streetlight/banner poles, luminaires, conduit and wiring along this corridor.  Because FM 518 is a TxDOT facility, the proposed lighting improvements will require coordination with TxDOT to ensure compliance with their requirements.  Furthermore, coordination with Texas-New Mexico Power (TNMP) is required for electrical services.  The City will be responsible for maintenance and operation of the system.  The PER scope includes a photometric analysis of the corridor, conceptual options for lighting design with various placements, height, spacing, fixtures and poles, and costs.  Future design and installation phases will be separated into Phase 1 - SH 3 to FM 270 and Phase 2 - IH 45 to SH 3.    

 

The Preliminary Engineering phase is anticipated to take approximately four to six months, excluding review and approval periods by the City, TxDOT, and TNMP.  Kimley-Horn tasks and fees are outlined as follows:

 

  Task

 

        Project Management, Coordination, QC/QA and Meetings

 

    $14,800

 

Agency Coordination (TxDOT and TNMP)

 

$8,000

 

Street Lighting Analysis

 

$24,700

 

Preliminary Engineering Report for Lighting Design

 

$23,000

 

Project Reimbursable Expenses Budget

 

  $2,000

Total, Not to Exceed Fee

 

   $72,500

 

 

 

Attachments:

1.                     Proposed Resolution

2.                     Exhibit A - PSA with Proposal

3.                     CIP Project Sheet

4.                     CIP Aerial Map

5.                     Vendor Report Card

                                     

FUNDING

{X} Total funding in the amount of $72,500 is available from Miscellaneous Capital Projects Fund, fund 5015, with expenses charged to project expense string ST2603-PLAN DESIGN - DESIGN - TS CASH.

 

STRATEGIC PLANNING

{X} Addresses Strategic Planning Critical Success Factor #1: Develop and Maintain our Infrastructure