Legislation Details

File #: 26-0507    Version: Name: HSIP Safety Improvements Project
Type: Agenda Item Status: Consent Agenda
File created: 11/3/2026 In control: Development Services
On agenda: 11/17/2026 Final action:
Title: Consider and take action on a resolution adding the League City Parkway: 2025 HSIP Safety Improvements Project (CSJ 0912-00-761) to the City’s FY2027 Capital Improvement Program and authorizing Staff to prepare an Advanced Funding Agreement with the Texas Department of Transportation for future Council consideration (Executive Director of Development Services)
Attachments: 1. Proposed Resolution, 2. Exhibit A – Study Limits.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Title
Consider and take action on a resolution adding the League City Parkway: 2025 HSIP Safety Improvements Project (CSJ 0912-00-761) to the City’s FY2027 Capital Improvement Program and authorizing Staff to prepare an Advanced Funding Agreement with the Texas Department of Transportation for future Council consideration (Executive Director of Development Services)

Background:
Approval of this item will authorize Staff to add the League City Parkway: 2025 HSIP Safety Improvements Project to the City’s FY2027 Capital Improvement Program and to prepare an Advanced Funding Agreement (AFA) with the Texas Department of Transportation (TxDOT) for Council consideration in early 2027.

In March 2025, Staff submitted the League City Parkway: 2025 HSIP Safety Improvements Project to TxDOT through the 2025 Highway Safety Improvement Program (HSIP) Call for Projects. TxDOT has accepted the submission and has notified Staff that the project is programmed for construction in FY2028.

The project will install approximately 2,800 linear feet of guardrail and rumble strips along League City Parkway (SH 96) to strengthen the protection of vehicles from the median drainage channel. The project limits begin approximately 575 feet west of the Hobbs Road intersection and extend east to the Landing Ditch intersection. The guardrail installation will provide a barrier between the travel lanes and the drainage feature located in the median, reducing the risk of vehicles leaving the roadway and entering the channel.

This project is being funded through the federal HSIP Category 8 program. The estimated construction cost is $248,398. Under the HSIP program structure, the standard 10% local government match will be covered by State-allocated Transportation Development Credits (TDCs), resulting in no construction cost to the City. However, TDCs cannot be used to cover design costs. Staff estimates a design fee of $45,000 will be required to design the project to TxDOT standards. The City...

Click here for full text