Title
Consider and take action on a resolution authorizing a professional services agreement with HR Green, Inc. for design, bid, and construction phase services related to the Asphalt Streets Rehabilitation Project Package 8 (RE1704I) in an amount not to exceed $207,425 (Executive Director of Capital Projects)
Background:
Approval of this resolution will authorize the award of a professional services agreement with HR Green, Inc. to perform the design, bid, and construction phase services related to the Asphalt Streets Rehabilitation Project Package 8 (RE1704I) for an amount not to exceed $207,425.
The purpose of this project is to perform road base repairs, asphalt resurfacing, or full-depth reconstruction as part of an annual infrastructure reinvestment program for City’s asphalt streets. The proposed Package 8 consists of Bern Street (St. Christopher Ave. to Smith Lane), Boden Street (Bern Street to Abilene Street), Austin Street (Texas Avenue to FM 270) from future package 9, and Landrum Street and 7th Street from previous Package 6.
In an effort to continue maximizing the Reinvestment dollars invested each year, staff is proposing to design approximately 4,180 linear feet of Asphalt Mill and Overlay or Full-Depth Replacement and incorporating 3,341 linear feet of Full-Depth Reconstruction of Landrum Avenue and 7th Street designed in Package 6, totaling 7,521 linear feet. The construction bid will include alternatives so the maximum number of streets can be awarded based on available Reinvestment cash at time of the award. Preliminary construction cost for Package 8 is estimated at $2.2M.
HR Green, Inc. has submitted a proposal to perform the design, bid and construction phase services for an amount not to exceed $207,425, which includes the following:
1. Design Phase $ 129,230
2. Bid Phase Services $ 8,360
3. Construction Phase Services $ 23,340
4. Topo Surveying & Mapping $ 24,145
5. Geotech Study $ 20,350
6. Miscellaneous Projec...
Click here for full text