Skip to main content
League City's Logo
File #: 26-0014    Version: 1 Name: W Walker 8 inch Waterline Back Feed Interconnect Project WT1904L
Type: Agenda Item Status: Consent Agenda
File created: 12/29/2025 In control: Capital Projects
On agenda: 1/13/2026 Final action:
Title: Consider and take action on a resolution authorizing a professional services agreement with Oller Engineering, Inc. for design, bid, and construction phase services related to the W. Walker 8-inch Waterline Back Feed Interconnect Project (WT1904L) in an amount not to exceed $70,945 (Executive Director of Capital Projects)
Attachments: 1. Proposed Resolution, 2. Exhibit A - Professional Service Agreement with Proposal, 3. Project General Location Aerial Map, 4. Water Sytem Map of Project Area, 5. CIP Project Sheet, 6. CIP Aerial Map (Modif), 7. Vendor Report Card
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Title
Consider and take action on a resolution authorizing a professional services agreement with Oller Engineering, Inc. for design, bid, and construction phase services related to the W. Walker 8-inch Waterline Back Feed Interconnect Project (WT1904L) in an amount not to exceed $70,945 (Executive Director of Capital Projects)

Background:
Approval of this resolution will authorize a professional services agreement with Oller Engineering, Inc. for design, bid, and construction phase services related to the W. Walker 8-inch Waterline Back Feed Interconnect Project (WT1904L) in an amount not to exceed $70,945.

This project is proposed to replace a SH 3 8-inch back feed interconnect project in FY 2025 budget. After some pre-design field investigations and costing, it was determined that such cased crossing would be considerably deep, not as accessible as desired, and expensive for such a short line. The W. Walker 8-inch line proposed herein will accomplish the same goal but with better access and integration into neighborhood distribution system. This project will design and install approximately 780 feet of 8-inch waterline from W. Walker along the CenterPoint Energy’s power corridor to the intersection of Interurban St. at W. Wilkins (see Attachment 3). This project will provide redundancy to the neighborhood old distribution system as well areas along SH 3 in the case of outages and also minimizes the number of services that would be shut off due to those outages. This area is currently served with a single 8-inch supply line from FM 518 down Interurban to West Galveston Road (see Attachment 4). Additionally, this line will provide a looping and supply line for a future neighborhood potential water distribution system upgrade.

The 8-inch line will be bored across W. Walker and constrained areas in CenterPoint Energy corridor and along an existing concrete-lined ditch and open-cut in other areas. Coordination, approval, and permitting will be require...

Click here for full text