File #: 26-0197    Version: 1 Name: 24" Water Line
Type: Agenda Item Status: Consent Agenda
File created: 5/12/2026 In control: Development Services
On agenda: 6/9/2026 Final action:
Title: Consider and take action on a resolution authorizing a Professional Services Agreement with GFT Infrastructure, Inc. in the amount of $345,000 for design, easement acquisition, bidding, and construction phase services associated with the extension of a 24-inch waterline along FM517 from approximately 900 feet west of Calder Road to approximately 700 feet east of Pedregal Boulevard (Executive Director of Development Services)
Attachments: 1. Proposed Resolution, 2. Professional Services Agreement - GFT Infrastructure, Inc., 3. CIP Project Sheet
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Title
Consider and take action on a resolution authorizing a Professional Services Agreement with GFT Infrastructure, Inc. in the amount of $345,000 for design, easement acquisition, bidding, and construction phase services associated with the extension of a 24-inch waterline along FM517 from approximately 900 feet west of Calder Road to approximately 700 feet east of Pedregal Boulevard (Executive Director of Development Services)

Background:
Approval of this item will authorize the City Manager to execute a Professional Services Agreement (PSA) with GFT Infrastructure, Inc. (GFT) for engineering, surveying, easement acquisition, bidding, and construction administration services associated with the extension of a 24-inch waterline along FM517.

The proposed project will extend approximately 24-inch water transmission infrastructure along FM517 from approximately 900 feet west of Calder Road to approximately 700 feet east of Pedregal Boulevard. This project is intended to support long-term water distribution system capacity, reliability, and future growth in accordance with the City’s Master Water Plan and related capital improvement planning efforts.

GFT has provided a preliminary estimated construction cost of approximately $2,797,500 for the project plus easement acquisition costs.

The proposed scope of services includes:
· Preparation of engineering design plans, specifications, and cost estimates for the proposed 24-inch waterline.
· Coordination with TxDOT and acquisition of required permits for work within FM 517 right-of-way.
· Easement acquisition support services, including surveying, metes and bounds descriptions, appraisals, negotiations, and acquisition coordination for approximately three easement parcels.
· Bid phase support, including pre-bid meetings, addenda preparation, bid tabulation, and recommendation of award.
· Construction phase services include shop drawing review, pay estimate review, construction coordination, substantial com...

Click here for full text