Consider and take action on Ordinance No. 2015-06 to temporarily reduce the posted speed along IH-45 southbound and northbound main lanes from the north city limit line to the south city limit line, a distance of approximately 3.735 miles, speed limit shall be reduced from 65 MPH to 55 MPH for the duration of the Texas Department of Transportation asphalt concrete pavement overlay project - Second Reading (Deputy City Manager)
Council approved first reading 7-1-0 on February 24, 2015.
Background:
Approval of this item will authorize the reduction of the posted speed on the IH-45 southbound and northbound main lanes for the duration of the TxDOT asphalt concrete pavement overlay project.
TxDOT is preparing for construction of an Asphalt concrete pavement overlay on the southbound and northbound main lanes. The traffic control study during construction requires a decrease of 10 mph of the posted speed, initiation of the required City Ordinance has been requested.
They (TxDOT) are requesting the City approve the reduction of the posted speed of 65 MPH to 55 MPH from the north city limit line to the south city limit line, a distance of approximately 3.735 miles. The project is scheduled for letting in April 2015. The anticipated start and completion date has not been stated by TxDOT at this time. Upon completion of the construction and removal of the traffic control devices the speed limit will return to 65 mph.
Attachments:
1) Data Sheet
2) TxDOT letter
3) Ordinance No. 2015-06
4) Aerial Map
CONTRACT ORIGINATION: Public Works Directorate
FUNDING
{X } NOT APPLICABLE
{ } Funds are available from Account #______________
{ } Requires Budget Amendment to transfer from Account #____________to Account # ___________