File #: 17-0297    Version: 1 Name: Ladder Tower Remount
Type: Agenda Item Status: Approved
File created: 4/21/2017 In control: Fire Department
On agenda: 5/9/2017 Final action: 5/9/2017
Title: Consider and take action on a resolution to approve the purchase of a remount of the current American LaFrance ladder tower on a new Spartan chassis from Metro Fire Apparatus Specialists, Inc. through HGACBuy in an amount not to exceed $745,709, authorize prepayment of the chassis cost in an amount not to exceed $325,188 and authorizing the expenditure of a work change directive in an amount not to exceed $5,000 (Fire Chief)
Attachments: 1. Data Sheet, 2. Proposed Resolution, 3. Metro Fire Proposal, 4. Proposed Agreement, 5. Prepayment Discount, 6. HGAC Pricing Worksheet, 7. Ladder Specifications, 8. Chassis Specifications
Title
Consider and take action on a resolution to approve the purchase of a remount of the current American LaFrance ladder tower on a new Spartan chassis from Metro Fire Apparatus Specialists, Inc. through HGACBuy in an amount not to exceed $745,709, authorize prepayment of the chassis cost in an amount not to exceed $325,188 and authorizing the expenditure of a work change directive in an amount not to exceed $5,000 (Fire Chief)
Background:
Approval of this resolution will authorize the purchase for a remount of the current American LaFrance ladder tower on a new Spartan chassis to return that unit to full front-line service status. The current unit, Tower Three, is out of service due to the failure of several ladder systems. Without a fully functional ladder, the tower is no longer safe to operate in an emergency. The original manufacturer is no longer in business and Metro is not comfortable repairing these systems due to implied liability and the lack of available replacement parts so the City has elected to perform a rebuild of the ladder and remount of the ladder system onto a new chassis. Among the many updates to the ladder tower system, outrigger controls will be inspected, cleaned and re-used. The existing ladder sections shall be placed in fixtures making the unit uniform and accessible for repair and shall be welded in accordance with American Welding Standards (AWS) criteria by certified welders. The existing aerial platform support structure consisting of high strength steel tubing, angles, and channels shall be stripped of paint and third party inspected. Any weld defect will be repaired. It will then be repainted. The handrails, floor and support structure shall be assembled to enable each component to be unbolted from each other for ease of replacement should a component of the platform be damaged.

The cost for a full replacement of the Tower Three vehicle would be approximately $1.4 million. If repair had been a possibility, the remainin...

Click here for full text