File #: 19-0665    Version: 1 Name: Power Factor Correction
Type: Agenda Item Status: Approved
File created: 12/3/2019 In control: Public Works
On agenda: 12/17/2019 Final action: 12/17/2019
Title: Consider and take action on a resolution authorizing an agreement with Hillhouse Power Solution, Inc. to provide and install power factor correction equipment in an amount not to exceed $79,900 (Director of Public Works)
Attachments: 1. Data Sheet, 2. Proposed Resolution, 3. Exhibit A - Agreement with Hillhouse Power Solutions Inc., 4. Power Factor Description
Title

Consider and take action on a resolution authorizing an agreement with Hillhouse Power Solution, Inc. to provide and install power factor correction equipment in an amount not to exceed $79,900 (Director of Public Works)

Background:

Approval of this resolution will authorize an agreement with Hillhouse Power Solutions, Inc. to install power factor correction equipment in an amount not to exceed $79,900. The turn-key project includes the installation of four (4) power factor correction systems at the following locations: 555 W. Walker (Public Safety Building), 701 N. Wisconsin Ave and 904 Satsuma (Dallas Salmon Wastewater Treatment Plant), and 4200 Grissom Rd (North Service Area Booster Pump Station). This service was performed as a turn-key engineering level study with installation of applicable power factor correction equipment. The engineering study was performed in late 2018 and funding for the follow-up hardware and installation was addressed during the FY2020 budget development process. The purchase of the power factor equipment will be procured through The Interlocal Purchasing System (TIPS), Contract No. 170905. Hillhouse Power Solutions, Inc. confirmed that no cost mark-up will be applied to any hardware purchases.

A preliminary engineering study was performed and identified the strategies and equipment to correct the power factor at the aforementioned locations, along with projected cost, savings, and payback. Power Factor charges were utilized and calculated on recent 12-months of power usage from November 2018 to October 2019. The project will result in a simple payback of 70 months.

To eliminate the monthly power factor charge, the Power Factor that is recorded for each electric meter during the 15-minute period of maximum demand each month should be elevated to above 95 percent for the three (3) locations served by Texas New Mexico Power Company. For the location served by Centerpoint, the Power Factor would be elevated to near 100 p...

Click here for full text