File #: 20-0038    Version: 1 Name: WT1904B ARKK design agreement
Type: Agenda Item Status: Approved
File created: 1/16/2020 In control: City Council
On agenda: 1/28/2020 Final action: 1/28/2020
Title: Consider and take action on a resolution authorizing a professional services agreement with ARKK Engineers, LLC for the design and construction phase services related to the Main Street Waterline Replacement Project (WT1904B) in an amount not to exceed $307,250 (Director of Budget and Project Management)
Attachments: 1. Data Sheet, 2. Proposed Resolution, 3. Exhibit A - Agreement with ARKK Engineers, 4. CIP Project Sheet and Aerial, 5. Vendor Report Card
Title
Consider and take action on a resolution authorizing a professional services agreement with ARKK Engineers, LLC for the design and construction phase services related to the Main Street Waterline Replacement Project (WT1904B) in an amount not to exceed $307,250 (Director of Budget and Project Management)

Background:
Approval of this resolution will authorize funding for the professional services agreement with ARKK Engineers, LLC for design and construction phase services related to the Main Street Waterline Replacement Project (WT1904B). This project is part of the Annual Waterline Upgrades and Replacement project which consists of replacing aging waterlines and upsizing waterlines to meet demand.

The scope consists of providing engineering design and construction phase services associated with the replacement of the existing 10-inch diameter water line along the northwest side of FM518, from Interstate 45 to State Highway 3, with a new 12-inch diameter water line. The total footage of water line to be replaced is estimated to be approximately 5,400 linear feet of 12-inch water mains, plus 1,050 linear feet of branching lines, included cased water line crossings of FM518. The project includes three (3) drainage channel crossings that are anticipated to be crossed using horizontal directional drilling methods. Based on preliminary cost estimates performed by ARKK, the estimated construction cost for the water line replacement is $2.5 million. Based on information available the proposed water line is anticipated to be installed within the general alignment area of the existing water line. At this time, no additional easements are anticipated to be required for this project. However, a budget for easement document preparation if determined to be necessary is included in this proposal.
The design will take 420 days, with 120 of those days required for topographic survey. Construction is programmed in the FY2020-2024 CIP for FY2022 to allow for completi...