Title
Consider and take action on a resolution authorizing work change directives #5-11 with Lucas Construction, Inc. for the Downtown Revitalization Plan - League Park and Drainage Improvements Project (ED1503) in an amount not to exceed $61,244 (Director of Budget & Project Management)
Background:
Approval of this item authorizes work change directives #5-11 in an amount not to exceed $61,244 with Lucas Construction, Inc for the Downtown Revitalization Plan - League Park and Drainage Improvements Project (ED1503).
The work at League Park includes the removal and salvage of existing site furniture, removal and replacement of concrete pavers, ADA ramps, removal of an existing turtle pond, installation of fencing, park grading with internal drainage, pedestrian and festoon lights, surface mounted flag lights, and electrical panel upgrades. The work also includes for removal of existing asphalt pavement and milling existing pavement on Railroad Avenue from 3rd Street to League Park. The work also includes the construction of a new parking lot with flexible base, asphalt wearing surface, swales, and 24-inch reinforced concrete pipe (RCP) with safety end treatments.
The drainage improvements work includes tying into an existing storm sewer on Park Avenue and installation of storm sewer from a 24-inch to 42-inch storm sewer along Railroad Avenue from E. Main Street to Coryell Street, and along Coryell Street from Railroad to Kansas Avenue where it ties into an existing 10-foot x 6-foot reinforced concrete box. The existing pavement will be milled and over-laid. The pavement above the storm sewer will be a full pavement replacement. The existing ditch along Railroad from Coryell to Fourth Street and Fourth Street from Railroad north will be regraded. Lastly, the existing water lines will be replaced along Coryell Street from Michigan Street to South Kansas Avenue.
On November 19, 2019, Council authorized the award of the construction contract to Lucas Constructi...