Legislation Details

File #: 23-0595    Version: 1 Name: Public Necessity Hwy 3 and 518
Type: Agenda Item Status: Approved
File created: 11/30/2023 In control: Capital Projects
On agenda: 12/12/2023 Final action: 12/12/2023
Title: Consider and take action on a resolution determining that land is needed for the construction and improvements associated with the SH3 at FM 518 Intersection Improvements Project (ST 2003) in the City of League City, Texas, specifically: 1) a 0.0456 acre parcel of land, 2) a 0.0042 acre parcel of land, 3) a 0.0943 acre parcel of land, 4) a 0.0770 acre parcel of land, 5) a 0.1228 acre parcel of land, 6) a 0.0594 acre parcel of land, 7) a 0.0248 acre parcel of land, 8) a 0.0092 acre parcel of land and 9) a 0.0043 acre parcel of land; and authorizing the institution of eminent domain proceedings (Executive Director of Capital Projects)
Attachments: 1. Data Sheet, 2. Proposed Resolution, 3. Schematic Layout - SH3 at FM518 Intersection Improvements, 4. Exhibit GIS Aerial of Proposed ROW Takings, 5. Metes and Bounds/Surveys and Exhibits
Topic
Consider and take action on a resolution determining that land is needed for the construction and improvements associated with the SH3 at FM 518 Intersection Improvements Project (ST 2003) in the City of League City, Texas, specifically: 1) a 0.0456 acre parcel of land, 2) a 0.0042 acre parcel of land, 3) a 0.0943 acre parcel of land, 4) a 0.0770 acre parcel of land, 5) a 0.1228 acre parcel of land, 6) a 0.0594 acre parcel of land, 7) a 0.0248 acre parcel of land, 8) a 0.0092 acre parcel of land and 9) a 0.0043 acre parcel of land; and authorizing the institution of eminent domain proceedings (Executive Director of Capital Projects)

Background:
If approved, this resolution establishes the Public Necessity to acquire real property interests in certain properties, and authorizes the uses of eminent domain powers for the acquisition of real property interests in the properties.

The purpose of this project is to improve the intersection flow capacity and decrease congestion.
Project design includes:
· Addition of 230 linear feet to the existing Left Turn Lane southbound on SH 3 and conversion of an existing Thru Lane southbound SH 3 into a second Left Turn Lane, and a new Right Turn Lane to southbound SH 3 at the FM 518 intersection
· Addition of 170 linear feet to an existing Right Thru Lane on southbound SH 3 south of the FM 518 intersection and 400 linear feet to an existing Left Turn Lane on northbound SH 3 at the FM 518 intersection
· Conversion of an existing Thru Lane on northbound SH 3 into a second Left Turn Lane and a new Right Turn Lane to northbound SH 3
· Addition of 180 linear feet to the existing Left Turn Lane on eastbound FM 518 with a raised curb median and a new Right Turn Lane eastbound on FM 518
· Conversion of a Right Turn/Thru Lane to a 460 linear foot Right Turn Lane on westbound FM 518 and an addition of 110 linear feet to the Left Turn Lane on westbound FM 518

Staff have exhausted all of their negotiations with the property own...

Click here for full text