File #: 24-0099    Version: 1 Name: DSWWTP Riser No. 6 Repair
Type: Agenda Item Status: Approved
File created: 2/13/2024 In control: Public Works
On agenda: 2/27/2024 Final action: 2/27/2024
Title: Consider and take action on a resolution authorizing an agreement with Alvin Contracting for the repair of Riser No. 6 at the Dallas Salmon Wastewater Treatment Plant (DSWWTP) Lift Station in an amount not to exceed $55,000 (Director of Public Works)
Attachments: 1. Data Sheet, 2. Proposed Resolution, 3. Exhibit A - Agreement with Alvin Contracting, 4. Quotes, 5. Vendor Report Card

Title

Consider and take action on a resolution authorizing an agreement with Alvin Contracting for the repair of Riser No. 6 at the Dallas Salmon Wastewater Treatment Plant (DSWWTP) Lift Station in an amount not to exceed $55,000 (Director of Public Works)

 

Background:

Approval of this resolution will authorize an agreement with Alvin Contracting for the repair of Riser No. 6 at DSWWTP Lift Station in an amount not to exceed $55,000.

 

The subject ductile iron pipe riser is one of six risers in the DSWWTP influent lift station that conveys wastewater from the collection system through the treatment plant process. These risers have been in service since 2006 and are subject to a highly corrosive atmosphere. All efforts to control leaks on this riser were exhausted due to extreme corrosion.  The riser repair is considered urgent in order to maintain full pumping capacity during extreme weather events. A lift station rehabilitation Capital Improvement Project is scheduled in the near future to address all riser pipes and other wet well related issues. This lift station serves approximately 80 percent of the City’s current wastewater collection service area and must be maintained to optimal service performance to ensure regulatory compliance.

 

The following quotes were obtained:

 

Alvin Contracting - $55,000

Pumps of Houston - $56,989

Coastal Pump Services, Inc. - $64,878

 

Alvin Contracting provided the lowest cost proposal in the amount $55,000, exceeding the $50,000 threshold limit requiring City Council’s approval.

 

Attachments:

1. Data Sheet

2. Proposed Resolution

3. Exhibit A - Agreement with Alvin Contracting

4. Quotes

5. Vendor Report Card

 

CONTRACT ORIGINATION: Staff

 

FUNDING

{X} Funds in the amount of $55,000 are available from Wastewater’s Utility System & Repair Account 10207500-52620.

 

STRATEGIC PLANNING

{X} Addresses Strategic Planning Critical Success Factor #1 - Develop and Maintain our Infrastructure